National Highways has advised that the M25 eastbound carriageway (towards Gatwick) at J10 between the exit slip road and the entry slip road, will be closed for 12 hours from 9pm Saturday 10 August to 9am Sunday. Traffic will temporarily leave the M25 at the J10 exit slip travelling around the gyratory before immediately rejoining the M25 via the J10 entry slip.
During this closure, the westbound carriageway (from Gatwick towards Heathrow) will be reduced to two lanes, but will remain open. All slip roads between the M25 and A3 will also be open and available.
Wisley Lane will be closed overnight from Monday 12 to Wednesday 14 August overnight closure (10pm to 5.30am), for UK Power Networks (UKPN) diversion works
Further details on the National Highways website here
This amounted to a near total closure with four lanes cut to one with traffic lights. There were no signs on the M3/M25 junction last night apart from a board saying “10 minute delay to J10.”
Really? I was stuck for over an hour on the M25 anti clockwise after J11 but before the exit slip at J10. Just who is the numpty resonsible for accurate signs? Two Tier Kier?